城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
21期
99-99
,共1页
混凝土池%地质条件%施工比较
混凝土池%地質條件%施工比較
혼응토지%지질조건%시공비교
concrete pool%geological conditions%construction comparing
本文对混凝土池在稀泥、流砂等地质条件上的沉降施工与传统大开挖施工进行了比较,对沉降施工与大开挖施工方法进行了探讨,实现了相关的经济效益。
本文對混凝土池在稀泥、流砂等地質條件上的沉降施工與傳統大開挖施工進行瞭比較,對沉降施工與大開挖施工方法進行瞭探討,實現瞭相關的經濟效益。
본문대혼응토지재희니、류사등지질조건상적침강시공여전통대개알시공진행료비교,대침강시공여대개알시공방법진행료탐토,실현료상관적경제효익。
In this paper, comparing between set lement cons-truction and traditional large excavation construction about concrete pool construction in the different geological condit-ions such as mud, sand flow is made in this paper. Methods for set lement construction and large excavation construction are discussed as wel , which implements the related economic benefits.