城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
24期
258-258
,共1页
公交场站改建工程%监理控制%设计变更
公交場站改建工程%鑑理控製%設計變更
공교장참개건공정%감리공제%설계변경
reconstruction project at bus station%supervision control%design changes
为了满足市民公交出行的需求,南京市不断加强扩大城市停车场地的改建。本文主要分析了南京沙洲停保场在改建过程中,如何加强设计变更的监理控制方法及提高设计变更监理效率,以促进南京公交场站改建工程的发展。
為瞭滿足市民公交齣行的需求,南京市不斷加彊擴大城市停車場地的改建。本文主要分析瞭南京沙洲停保場在改建過程中,如何加彊設計變更的鑑理控製方法及提高設計變更鑑理效率,以促進南京公交場站改建工程的髮展。
위료만족시민공교출행적수구,남경시불단가강확대성시정차장지적개건。본문주요분석료남경사주정보장재개건과정중,여하가강설계변경적감리공제방법급제고설계변경감리효솔,이촉진남경공교장참개건공정적발전。
In order to meet the public transit demand, Nanjing city continues to strengthen the expansion of rebuilding park-ing lots. This paper mainly analyzed how the builders strength-hen the control method of design change in supervision and improve the efficiency of design change management in the conversion process of the stop protect field in Nanjing, in order to promote the development of reconstruction project at bus st-ations in Nanjing.