城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
26期
71-71,96
,共2页
邓远洋%黄明华%徐小红
鄧遠洋%黃明華%徐小紅
산원양%황명화%서소홍
超大梁%大直径柱%钢骨柱%抗剪钢板%施工工序
超大樑%大直徑柱%鋼骨柱%抗剪鋼闆%施工工序
초대량%대직경주%강골주%항전강판%시공공서
super beam%large diameter column%steel rein- forced concrete column%shear plate%construction process
本文结合佛山雄盛王府广场项目框支剪力墙结构的转换层柱及梁截面尺寸大、柱中设计有钢骨、梁柱接头位置有抗剪钢板等特点,重点介绍了转换层各工种、工序如何穿插衔接配合,从而解决了加快现场工期进度等问题。
本文結閤彿山雄盛王府廣場項目框支剪力牆結構的轉換層柱及樑截麵呎吋大、柱中設計有鋼骨、樑柱接頭位置有抗剪鋼闆等特點,重點介紹瞭轉換層各工種、工序如何穿插銜接配閤,從而解決瞭加快現場工期進度等問題。
본문결합불산웅성왕부엄장항목광지전력장결구적전환층주급량절면척촌대、주중설계유강골、량주접두위치유항전강판등특점,중점개소료전환층각공충、공서여하천삽함접배합,종이해결료가쾌현장공기진도등문제。
This paper combined with the characteristics of columns of conversion layer and section size of large beam, steel support in column design shear plate at joint position of columns in the frame supported shear wal structure in Xiongsheng Palace Square project in Foshan city, mainly introduced the connection methods between the coordination processes of conversion layers, thus to speed up construction progress problems.