排海工程%超长距离顶管%技术措施
排海工程%超長距離頂管%技術措施
배해공정%초장거리정관%기술조시
discharged ocean engineering%long distance pipe jacking%technical measures
上海污水处理排海顶管工程一次顶进2050m,属于超长距离顶管。由于很好解决了超长距离顶进施工中的减阻泥浆、中继间运用、轴线控制等技术难题,仅用了144天就完成了全部顶进施工如管,创造了同类工程的世界记录。
上海汙水處理排海頂管工程一次頂進2050m,屬于超長距離頂管。由于很好解決瞭超長距離頂進施工中的減阻泥漿、中繼間運用、軸線控製等技術難題,僅用瞭144天就完成瞭全部頂進施工如管,創造瞭同類工程的世界記錄。
상해오수처리배해정관공정일차정진2050m,속우초장거리정관。유우흔호해결료초장거리정진시공중적감조니장、중계간운용、축선공제등기술난제,부용료144천취완성료전부정진시공여관,창조료동류공정적세계기록。
The discharge pipe jacking engineering in Shanghai was jacked for 2050m for sewage treatment, and it belongs to a pipe jacking of super long distance. Due to the solutions of the resistance slurry, relaying usage, technical problems of axis control in the construction of the long distance jacking, the ja- cking construction was completed in only 144 days and created a world record compared to similar project.