城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2012年
18期
69-70
,共2页
提梁站%钢管桩%贝雷梁
提樑站%鋼管樁%貝雷樑
제량참%강관장%패뢰량
girder station%steel pipe piles%Bailey beam
广深沿江高速深圳段提梁站施工采用钢管桩结合贝雷梁形式.提梁站与现浇箱梁净空高度7m,跨度为17.25m,文章就提梁站的安装方法作简要介绍.
廣深沿江高速深圳段提樑站施工採用鋼管樁結閤貝雷樑形式.提樑站與現澆箱樑淨空高度7m,跨度為17.25m,文章就提樑站的安裝方法作簡要介紹.
엄심연강고속심수단제량참시공채용강관장결합패뢰량형식.제량참여현요상량정공고도7m,과도위17.25m,문장취제량참적안장방법작간요개소.
Guangshen Coastal Expressway Shenzhen Girder Station uses the steel pipe piles combined with Bailey girders in the construction.The headroom of the girder stations and the cast-in-place box girder is 7m, and the span is 17.25m. This paper makes a brief description of the installation method of the girder station