城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2013年
2期
281
,共1页
房地产项目%全过程成本控制%对策与措施
房地產項目%全過程成本控製%對策與措施
방지산항목%전과정성본공제%대책여조시
real estate projects%the whole process of cost con-trol%strategies and measures
本文以房地产项目成本控制为研究对象,提出了多角度、全方位、全过程探索减少投入、节约成本的途径,做好成本管理计划、成本预测等工作.发现问题及时采取措施或调整有关要求或标准,确保企业立于不败之地.
本文以房地產項目成本控製為研究對象,提齣瞭多角度、全方位、全過程探索減少投入、節約成本的途徑,做好成本管理計劃、成本預測等工作.髮現問題及時採取措施或調整有關要求或標準,確保企業立于不敗之地.
본문이방지산항목성본공제위연구대상,제출료다각도、전방위、전과정탐색감소투입、절약성본적도경,주호성본관리계화、성본예측등공작.발현문제급시채취조시혹조정유관요구혹표준,학보기업립우불패지지.
Based on the real estate project cost control as the research object, puts forward the ways of multi-angle, al -roun-d, the whole process of exploration to reduce investment and s-aving cost, makes the cost management plan, cost prediction. Found problems in a timely manner to take measures or adjust the relevant requirements or standards to ensure that the enter-prises remain invincible.