城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2013年
2期
107-108
,共2页
走行轨%预留孔模具%钢轨焊接%施工
走行軌%預留孔模具%鋼軌銲接%施工
주행궤%예류공모구%강궤한접%시공
walking track%the reserved hole mould%rail weld-ing%construction
本文通过对集装箱龙门吊走行轨施工中龙门吊走行轨基础梁及桩基承台建设、预埋螺栓孔预留、走行轨(U80钢轨)安装、钢轨焊接及检测、设置相关配套的电缆槽和电缆井等施工措施及其质量控制的阐述,为解决集装箱龙门吊走行轨施工中高精度的要求提供一些参考.
本文通過對集裝箱龍門弔走行軌施工中龍門弔走行軌基礎樑及樁基承檯建設、預埋螺栓孔預留、走行軌(U80鋼軌)安裝、鋼軌銲接及檢測、設置相關配套的電纜槽和電纜井等施工措施及其質量控製的闡述,為解決集裝箱龍門弔走行軌施工中高精度的要求提供一些參攷.
본문통과대집장상룡문조주행궤시공중룡문조주행궤기출량급장기승태건설、예매라전공예류、주행궤(U80강궤)안장、강궤한접급검측、설치상관배투적전람조화전람정등시공조시급기질량공제적천술,위해결집장상룡문조주행궤시공중고정도적요구제공일사삼고.
Based on the describe of container gantry crane, g-antry crane rail line construction track foundation beam and pi-le cap construction, pre-buried bolt hole reserved, track (U80 r-ail) instal ation, and detection, rail welding set cable trough an-d cable wel construction measures of supporting and its quali-ty control,this paper in order to solve the container gantry cran-e running rail construction in high precision required providing some reference.