建设工期%工程造价%工期优化
建設工期%工程造價%工期優化
건설공기%공정조개%공기우화
construction period%project cost%project optimiz-ation
“质量好、工期短、造价低”是对建设工程提出的三大要求.本文阐述工期的定义及其意义,工期与造价的对立统一关系及确定合理工期,以期提高企业的经济效益.
“質量好、工期短、造價低”是對建設工程提齣的三大要求.本文闡述工期的定義及其意義,工期與造價的對立統一關繫及確定閤理工期,以期提高企業的經濟效益.
“질량호、공기단、조개저”시대건설공정제출적삼대요구.본문천술공기적정의급기의의,공기여조개적대립통일관계급학정합리공기,이기제고기업적경제효익.
The three requirements of construction project is“good quality, short construction period, low cost”. This pape-r explains the definition and significance of the unity of oppos-ites between construction period, construction period and cost and determine the rational construction period, in order to imp-rove the economic efficiency of enterprises.