输电线路%吊车组合%立塔%施工
輸電線路%弔車組閤%立塔%施工
수전선로%조차조합%립탑%시공
transmission lines%crane combination%vertical tower%construction
新疆与西北主网联网750千伏第二通道线路工程(第5标段)位于哈密地区戈壁滩,地形平坦,适合大规模采用吊车进行组立,根据塔高采取多种吨位的吊车组合进行铁塔组立,施工效率高,综合成本低,施工安全可靠,取得良好的效果.
新疆與西北主網聯網750韆伏第二通道線路工程(第5標段)位于哈密地區戈壁灘,地形平坦,適閤大規模採用弔車進行組立,根據塔高採取多種噸位的弔車組閤進行鐵塔組立,施工效率高,綜閤成本低,施工安全可靠,取得良好的效果.
신강여서북주망련망750천복제이통도선로공정(제5표단)위우합밀지구과벽탄,지형평탄,괄합대규모채용조차진행조립,근거탑고채취다충둔위적조차조합진행철탑조립,시공효솔고,종합성본저,시공안전가고,취득량호적효과.
The second channel (Lot5) project of Xinjiang and the northwest main network interconnection 750 kV line is located in the Gobi Desert of Hami region, and its terrain is flat, so it is suitable for using the large-scale crane assembly. The way of taking a variety of crane combination according to the height of tower to do tower assembly has achieved good results due to its high efficiency, low cost, safe and reliable construction.