针对当前城市地下空间(地铁站)开发遇到的投资大,工期长,工效低等顽症,笔者提出了地下空间封闭式开发的新理念,建构了地铁站新的结构体系、工艺技术以及配套的施工方法,力争使地下空间开发走向机械化,工业化,自动化道路.
針對噹前城市地下空間(地鐵站)開髮遇到的投資大,工期長,工效低等頑癥,筆者提齣瞭地下空間封閉式開髮的新理唸,建構瞭地鐵站新的結構體繫、工藝技術以及配套的施工方法,力爭使地下空間開髮走嚮機械化,工業化,自動化道路.
침대당전성시지하공간(지철참)개발우도적투자대,공기장,공효저등완증,필자제출료지하공간봉폐식개발적신이념,건구료지철참신적결구체계、공예기술이급배투적시공방법,력쟁사지하공간개발주향궤계화,공업화,자동화도로.
Aiming at the chronic problems in the development of urban underground space (subway station), such as, large investment, long construction period, low work efficiency, and so on, the author proposes a new idea of closed underground space development, constructs new structural system, technology and supporting construction methods of subway station, and strives to make the underground space development toward mechanization, industrialization and automation.