深基坑%降水处理%管涌%连续墙%偷工减料
深基坑%降水處理%管湧%連續牆%偷工減料
심기갱%강수처리%관용%련속장%투공감료
deep foundation pit%dewatering process%piping%continuous wall%jerry-build
在地下车站施工过程中,监理人员应该解决好挖深基坑出现的含水位、水的压力作用等问题;本文对管涌现象,连续墙建造所注意事项进行了探究,分别做出作降水处理、平衡水压力、连续墙各个步骤处理方法分析,并对监理人员应该如何做出解决办法进行深究.
在地下車站施工過程中,鑑理人員應該解決好挖深基坑齣現的含水位、水的壓力作用等問題;本文對管湧現象,連續牆建造所註意事項進行瞭探究,分彆做齣作降水處理、平衡水壓力、連續牆各箇步驟處理方法分析,併對鑑理人員應該如何做齣解決辦法進行深究.
재지하차참시공과정중,감리인원응해해결호알심기갱출현적함수위、수적압력작용등문제;본문대관용현상,련속장건조소주의사항진행료탐구,분별주출작강수처리、평형수압력、련속장각개보취처리방법분석,병대감리인원응해여하주출해결판법진행심구.
In the construction of underground station process, supervisors should pressure ef ects such as well to solve the problem of deep foundation pit digging containing water level, water appears; the piping phenomenon, continuous wal const-ruction the mat ers needing at ention are discussed, respect-ively to make precipitation treatment, balance water pressure, continuous wall each step processing method of analysis, and how to make the solutions are further should the supervision personnel.