高层建筑弱电系统安装时管线敷设复杂,布线全过程在建筑弱电系统设计安装中起着决定性作用,且安装时信息点多、作业空间大.本文主要是从布线施工、系统设备、线缆设备、网络设备等方面分析了高层建筑弱点系统安装和施工.
高層建築弱電繫統安裝時管線敷設複雜,佈線全過程在建築弱電繫統設計安裝中起著決定性作用,且安裝時信息點多、作業空間大.本文主要是從佈線施工、繫統設備、線纜設備、網絡設備等方麵分析瞭高層建築弱點繫統安裝和施工.
고층건축약전계통안장시관선부설복잡,포선전과정재건축약전계통설계안장중기착결정성작용,차안장시신식점다、작업공간대.본문주요시종포선시공、계통설비、선람설비、망락설비등방면분석료고층건축약점계통안장화시공.
The piping instal ation of weak electricity system in high-rise building is complicated, wiring in the whole proce-ss of building weak current system design and instal ation pla-ys a decisive role, with instal ation information points, large working space. This paper is mainly from the aspects of const-ruction, wiring system equipment, cable equipment, network equipment, analyzes the weaknesses of the system instal ation and construction of high-rise building.