城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2013年
8期
273-274
,共2页
大底盘%多塔地下室%差异沉降%协调技术
大底盤%多塔地下室%差異沉降%協調技術
대저반%다탑지하실%차이침강%협조기술
large chassis%multi-tower basement%differential set lement%coordination technology
结构整体分析时嵌固端的确定、地基基础设计中的差异沉降控制、超长地下室的防开裂措施是大底盘多塔高层设计中的关键性技术问题.本文主要探讨了大底盘多塔地下室的差异沉降协调技术.
結構整體分析時嵌固耑的確定、地基基礎設計中的差異沉降控製、超長地下室的防開裂措施是大底盤多塔高層設計中的關鍵性技術問題.本文主要探討瞭大底盤多塔地下室的差異沉降協調技術.
결구정체분석시감고단적학정、지기기출설계중적차이침강공제、초장지하실적방개렬조시시대저반다탑고층설계중적관건성기술문제.본문주요탐토료대저반다탑지하실적차이침강협조기술.
The determination of embedded solid end when ov-eral analysis of the structure, the dif erential set lement cont-rol of the foundation design and the anti-cracking measures of the long basement are the key technical problems in high-rise design of the large chassis multi-tower. This article mainly dis-cusses the differential set lement coordination technology of the large chassis multi-tower basement.