核电厂%非硬质岩%地基适宜性
覈電廠%非硬質巖%地基適宜性
핵전엄%비경질암%지기괄의성
nuclear power plant%non-hard rock%suitability of foundation
随着我国核电事业的不断发展,在非硬质岩石地基上建设核电项目将势必进行。本文结合粤西一个 AP-1000机型的非硬质岩地基核电厂,分别按AP-1000标准文件要求、工程案例类比等方法,对核电厂非硬质岩地基的适宜性作出了合理的评价。
隨著我國覈電事業的不斷髮展,在非硬質巖石地基上建設覈電項目將勢必進行。本文結閤粵西一箇 AP-1000機型的非硬質巖地基覈電廠,分彆按AP-1000標準文件要求、工程案例類比等方法,對覈電廠非硬質巖地基的適宜性作齣瞭閤理的評價。
수착아국핵전사업적불단발전,재비경질암석지기상건설핵전항목장세필진행。본문결합월서일개 AP-1000궤형적비경질암지기핵전엄,분별안AP-1000표준문건요구、공정안례류비등방법,대핵전엄비경질암지기적괄의성작출료합리적평개。
Along with the development of nuclear power ind-ustry in China, so nuclear power projects on the foundation of on-hard rock are bound to be constructed. Combining a AP-1 model 000 non-nuclear power plants on hard rock foundation in Western Guangdong, according respectively to the methods of requirements of AP-1000 standard documents and case ana-logy, made a reasonable assessment of the suitability of the fo-undation of non-hard rock applied to the nuclear power plant.