城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
29期
84-85
,共2页
前期准备%灌注桩%预制桩%防治措施
前期準備%灌註樁%預製樁%防治措施
전기준비%관주장%예제장%방치조시
previous preparation%cast-in-place pile%precast piles%prevention measures
本文阐述了桩基础施工过程中出现的各种通病,并介绍了施工前期准备工作和各项桩基施工工艺,重点分析了钢筋混凝土灌注桩和预制桩施工中常见的通病和防治措施的应用,以期在日后的施工中能够避免类似问题的发生,使施工更方便、高效。
本文闡述瞭樁基礎施工過程中齣現的各種通病,併介紹瞭施工前期準備工作和各項樁基施工工藝,重點分析瞭鋼觔混凝土灌註樁和預製樁施工中常見的通病和防治措施的應用,以期在日後的施工中能夠避免類似問題的髮生,使施工更方便、高效。
본문천술료장기출시공과정중출현적각충통병,병개소료시공전기준비공작화각항장기시공공예,중점분석료강근혼응토관주장화예제장시공중상견적통병화방치조시적응용,이기재일후적시공중능구피면유사문제적발생,사시공경방편、고효。
This paper describes various defects occurred duri-ng pile foundation construction, and introduces the construc-tion preparation work and the pile foundation construction technology, analyses the common fault and the application of prevention measures of reinforced concrete piles and precast pile construction, in order to avoid similar problems occurred in the construction of the day after, which makes the constr-uction more convenient and efficient.