水厂%工艺流程%构筑物组(叠)合设计
水廠%工藝流程%構築物組(疊)閤設計
수엄%공예류정%구축물조(첩)합설계
water plant%process%structures group (laminated) design
澄迈县现状金江水厂规模2.0×104 m3/d。随着澄迈县城的发展,供水量已不能满足用水需要,亟需增加供水量。新建江南水厂设计规模3.0×104 m3/d,针对厂区面积受限的特点,本工程构筑物采用组(叠)合设计。
澄邁縣現狀金江水廠規模2.0×104 m3/d。隨著澄邁縣城的髮展,供水量已不能滿足用水需要,亟需增加供水量。新建江南水廠設計規模3.0×104 m3/d,針對廠區麵積受限的特點,本工程構築物採用組(疊)閤設計。
징매현현상금강수엄규모2.0×104 m3/d。수착징매현성적발전,공수량이불능만족용수수요,극수증가공수량。신건강남수엄설계규모3.0×104 m3/d,침대엄구면적수한적특점,본공정구축물채용조(첩)합설계。
Jinjiang water plant in Chengmai County has the size of 2.0×104m3/d. With the development of Chengmai Cou-nty, water supply has been unable to meet the need, so there is urgent need to increase the quantity of water supply. The New Jiangnan water plant is designed with a size of 3.0×104m3/d. Because the factory area is limited, the engineering structures applied group (overlapping) design.