价值工程
價值工程
개치공정
VALUE ENGINEERING
2015年
1期
133-134
,共2页
自动抽排水%秦岭隧洞%斜井%反坡
自動抽排水%秦嶺隧洞%斜井%反坡
자동추배수%진령수동%사정%반파
automatic water pumping and drainage%Qinling Mountains Tunnel%inclined shaft%reverse slope
国内长大隧洞反坡排水常规方式还处于利用人工操作机械的阶段,施工中如泵站设置数量较多,需安排大量劳动力参与排水,管理繁琐,人力、财力耗费也大。本文结合秦岭隧洞7号洞应用实例,介绍反坡自动抽排水系统,供相关专业人员参考。
國內長大隧洞反坡排水常規方式還處于利用人工操作機械的階段,施工中如泵站設置數量較多,需安排大量勞動力參與排水,管理繁瑣,人力、財力耗費也大。本文結閤秦嶺隧洞7號洞應用實例,介紹反坡自動抽排水繫統,供相關專業人員參攷。
국내장대수동반파배수상규방식환처우이용인공조작궤계적계단,시공중여빙참설치수량교다,수안배대량노동력삼여배수,관리번쇄,인력、재력모비야대。본문결합진령수동7호동응용실례,개소반파자동추배수계통,공상관전업인원삼고。
Domestic long tunnel reverse slope drainage is still using the conventional way by manual operation of the machinery. As in the construction, the number of pumping station is large, it needs a large number of labor force for drainage, its management it complex, human and financial waste is huge. In this paper, combined with the application example of Qinling Mountains Tunnel No.7 cave, the reverse slope automatic pumping and drainage system is introduced to provide the reference for the related professional members.