城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
36期
105-105
,共1页
CFG桩%复合地基%承载力
CFG樁%複閤地基%承載力
CFG장%복합지기%승재력
CFG pile%composite foundation%bearing capacity
南水北调温博三标大沙河倒虹吸CFG桩试验区施工,在检测时发现了质量问题。通过一系列的分析、研究,找到了出现质量问题的原因。本文就这个问题进行了分析总结,希望能为以后的CFG桩施工提供借鉴。
南水北調溫博三標大沙河倒虹吸CFG樁試驗區施工,在檢測時髮現瞭質量問題。通過一繫列的分析、研究,找到瞭齣現質量問題的原因。本文就這箇問題進行瞭分析總結,希望能為以後的CFG樁施工提供藉鑒。
남수북조온박삼표대사하도홍흡CFG장시험구시공,재검측시발현료질량문제。통과일계렬적분석、연구,조도료출현질량문제적원인。본문취저개문제진행료분석총결,희망능위이후적CFG장시공제공차감。
The south to North Water Diversion Wenbo three standard Shahe inverted siphon CFG pile test area construction, we discovered quality problems in the detection. Through a se- ries of analysis and research, we found the causes of quality pr- oblems. In this paper, the author analyzed and summarized the problems, hoping to provide reference for the future construc- tion of CFG pile.