价值工程
價值工程
개치공정
VALUE ENGINEERING
2015年
7期
31-32
,共2页
合同价款调整%项目特征%工程量清单%工程量偏差
閤同價款調整%項目特徵%工程量清單%工程量偏差
합동개관조정%항목특정%공정량청단%공정량편차
project contract price adjustment%characteristics%BOQ%engineering quantity deviation
合同价款调整实务中的影响因素有很多,2013清单规范下对施工阶段合同价款的调整因素相比08版作了更详细和系统的说明。本文对其中三个因素针对13版和08版的前后变化作分析说明,分别是:项目特征描述不符、工程量清单缺项和工程量偏差。
閤同價款調整實務中的影響因素有很多,2013清單規範下對施工階段閤同價款的調整因素相比08版作瞭更詳細和繫統的說明。本文對其中三箇因素針對13版和08版的前後變化作分析說明,分彆是:項目特徵描述不符、工程量清單缺項和工程量偏差。
합동개관조정실무중적영향인소유흔다,2013청단규범하대시공계단합동개관적조정인소상비08판작료경상세화계통적설명。본문대기중삼개인소침대13판화08판적전후변화작분석설명,분별시:항목특정묘술불부、공정량청단결항화공정량편차。
There are many factors that affect the contract price adjustment in practice. Compared with the 08 version, the 2013 list of specifications made a more detailed and systematic explanation of the contract price adjustment factors in the construction stage. This paper focuses on the changes of three factors in the 13 edition and 08 edition, which are: project feature description discrepancy, BOQ missing items and engineering quantity deviation.