重庆某工程位于长江与嘉陵江交汇处。其在人工挖孔桩施工中,遇到了很厚的卵石层。卵石塌方严重,紧挨卵石处护壁成悬空状态,危及到了孔内作业人员的人身安全,导致无法成孔。本文主要介绍了卵石人工挖孔桩施工技术成孔经验,可供类似工程借鉴。
重慶某工程位于長江與嘉陵江交彙處。其在人工挖孔樁施工中,遇到瞭很厚的卵石層。卵石塌方嚴重,緊挨卵石處護壁成懸空狀態,危及到瞭孔內作業人員的人身安全,導緻無法成孔。本文主要介紹瞭卵石人工挖孔樁施工技術成孔經驗,可供類似工程藉鑒。
중경모공정위우장강여가릉강교회처。기재인공알공장시공중,우도료흔후적란석층。란석탑방엄중,긴애란석처호벽성현공상태,위급도료공내작업인원적인신안전,도치무법성공。본문주요개소료란석인공알공장시공기술성공경험,가공유사공정차감。
A project in Chongqing is located in the Yangtze River and Jialing River interchange. In the construction of ma-nual bored pile, builders encountered a thick layer of cobbl-estone. The cobblestone col apses seriously, and the retaining wal closely to the gravel is at hanging state, which endangers workers’ safety, thus the holing is a failure. This paper mainly introduces the experience of construction technology of man-ual bored pile of cobblestone which can be used for reference for the similar project experience.