城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
33期
286-286,313
,共2页
水电站%增效扩容%必要性%效益
水電站%增效擴容%必要性%效益
수전참%증효확용%필요성%효익
hydropower station%synergistic expansion%neces-sity%benefit
东武仕水电站自建成投入运行至今已40多年,机电设备严重老化,运行效率降低。针对这些问题,本文从必要性和效益性两方面,分析了电站增效扩容改造建设的可行性,具有较好的社会效益。
東武仕水電站自建成投入運行至今已40多年,機電設備嚴重老化,運行效率降低。針對這些問題,本文從必要性和效益性兩方麵,分析瞭電站增效擴容改造建設的可行性,具有較好的社會效益。
동무사수전참자건성투입운행지금이40다년,궤전설비엄중노화,운행효솔강저。침대저사문제,본문종필요성화효익성량방면,분석료전참증효확용개조건설적가행성,구유교호적사회효익。
It has been more than 40 years since the Dongw-ushi Hydropower Station was built and put into operation, so the mechanical and electrical equipment is aging, and its op-erating efficiency is decreasing. Aiming at solving these prob-lems, this article, from the two aspects of the necessity and be-nefit, analyzes the feasibility of the construction of synergistic expansion and transformation of the station which proved to have good social benefits.