VALUE ENGINEERING
2015年
14期
162-163,164
,共3页
客运专线%有砟轨道%道岔%插铺
客運專線%有砟軌道%道岔%插鋪
객운전선%유사궤도%도차%삽포
dedicated passenger line%ballasted track%turnout%plug shop
文章通过时速250km柳南客专插铺P60-18#道岔的工程实例,探讨在客专营业线插铺大号道岔对位预铺、横向滑移、线路捣固等施工工艺流程和安全控制措施,优化既有客专插铺道岔的施工方案,从而减少施工干扰、提高施工效率、缩短封锁时间,为今后的同类施工积累了宝贵经验。
文章通過時速250km柳南客專插鋪P60-18#道岔的工程實例,探討在客專營業線插鋪大號道岔對位預鋪、橫嚮滑移、線路擣固等施工工藝流程和安全控製措施,優化既有客專插鋪道岔的施工方案,從而減少施工榦擾、提高施工效率、縮短封鎖時間,為今後的同類施工積纍瞭寶貴經驗。
문장통과시속250km류남객전삽포P60-18#도차적공정실례,탐토재객전영업선삽포대호도차대위예포、횡향활이、선로도고등시공공예류정화안전공제조시,우화기유객전삽포도차적시공방안,종이감소시공간우、제고시공효솔、축단봉쇄시간,위금후적동류시공적루료보귀경험。
With the case of 250km dedicated passenger line plug shop P60-18# turnout project, this paper discussed the counterpoint pre-shop, lateral slip, tamping and other construction process of dedicated passenger line plug shop large turnout as well as the safety control measures, and optimized the existing construction program, thereby reducing construction interference, improving construction efficiency, shortening block time and accumulating valuable experience for future similar construction.