价值工程
價值工程
개치공정
VALUE ENGINEERING
2015年
14期
101-103
,共3页
超超临界机组%施工图%优化设计
超超臨界機組%施工圖%優化設計
초초림계궤조%시공도%우화설계
ultra-supercritical unit%construction drawing%optimization design
本文介绍了660MW超超临界机组汽机房布置特点,总结了汽机专业施工图优化设计成果及施工调试阶段出现的典型问题。通过优化设计共节省材料成本487.1万元。
本文介紹瞭660MW超超臨界機組汽機房佈置特點,總結瞭汽機專業施工圖優化設計成果及施工調試階段齣現的典型問題。通過優化設計共節省材料成本487.1萬元。
본문개소료660MW초초림계궤조기궤방포치특점,총결료기궤전업시공도우화설계성과급시공조시계단출현적전형문제。통과우화설계공절성재료성본487.1만원。
This paper introduces 660MW ultra-supercritical unit turbine house arrangement and summarizes construction drawing optimal design of the steam turbine and the typical problems during the construction and debugging stage. 4.871 million yuan of material cost is saved by the optimal design.